The Power System Simulation Lab constructed specifically for the Three Gorges AC/DC hybrid transmissionstudy is equipped mainly with a real-time power system simulator, which can jointly operate with existing TNA andHVDC Simulator respectively. Appraised by the State Power Corporation 3 years ago, this Lab was proved reachinginternational advanced level. Several large-scaled power system studies, such as the "Simplified Three Gorges PowerSystem Study" have achieved good results.[