The pre-crack blast technology has been used to control the induction caving area in the roof. The key is to form the pre-crack seam and predict the effect of the seam. The H-J-C blast model was built in the roof. Based on the theories of dynamic strength and failure criterion of dynamic rock, the rock dynamic damage and the evolution of pre-crack seam were simulated by the tensile damage and shear failure of the model. According to the actual situation of No. 92 ore body test stope at Tongkeng Mine, the formation process of the pre-crack blast seam was simulated by Ansys/Ls-dyna software, the pre-crack seam was inspected by a system of digital panoramic borehole camera. The pre-crack seam was inspected by the system of digital panoramic borehole in the roof. The results of the numerical simulation and inspection show that in the line of centers of pre-hole, the minimum of the tensile stress reaches 20 MPa, which is much larger than 13.7 MPa of the dynamic tensile strength of rock. The minimum particle vibration velocity reaches 50 cm/s, which is greater than 30-40 cm/s of the allowable vibration velocity. It is demonstrated that the rock is destroyed near the center line and the pre-crack is successfully formed by the large diameters and large distances pre-crack holes in the roof.
In order to quantify the characteristics of the surface of jointed rock mass,new equipment,the three-dimensional laser surface topography instrument,was used to accurately measure surface morphology of joints.Scan pictures and parameters were obtained to describe the rock joint surface characteristics,for example,the height frequency of surface,and mean square roughness.Using the method of fractal dimension,the values of joint roughness coefficient(JRC) were calculated based on the above parameters.It could access to the joint surface rock sample morphology of the main parameters of characteristic.The maximum peak height is 2.692 mm in the test joint plane.The maximum profile height is 4.408 mm.JRC value is 6.38 by fractal dimension computing.It belongs to the smooth joint surface.The results show that it is a kind of the effective method to quantitatively evaluate the surface topography by the three-dimensional laser surface topography instrument and the fractal dimension method.According to the results,during the process of underground large-scale mining,safe measures to prevent slip failure of the joint plane by controlling surface tension and shear mechanical response were proposed.