The China Spallation Neutron Source (CSNS) front end incorporates a pre-chopper in the Low Energy Beam Transport line (LEBT) that will remove a 530 ns section of beam at approximately 1 MHz rate, which is the RF frequency of the ring at injection. It's one of the most critical devices for properly controlling the injecting beam loss. Physical designing of the pre-chopper is carried out, and the RFQ itself is used as the beam dump of the chopper system. In order to examine the reliability of the pre-chopper design, the beam study of a similar chopper system is successfully performed. The results of physical design and experiments are presented.
LIU HuaChangOUYANG HuaFuPENG JunHUANG TaoGONG KeYunXU TaoGuangFU ShiNian
Now that the CSNS ion source test stand has been stably working for years, an online control system for the CSNS ion source which aims to be more stable and reliable is now under development. F3RP61-2L, a new PLC CPU module running an embedded Linux system, is introduced to the system as an IOC, to function together with the I/O modules of FA-M3 PLC on the PLC-bus. The adoption of the new IOC not only simplifies the architecture of the control system, but also improves the data transmission speed. In this paper, the design and development of the supervisory and control system for the CSNS ion source are described.